16.
EIA
Pipelines with a diameter of more than 800 mm and a length of more than 40 km: for the transport of gas, oil, chemicals; for the transport of carbon dioxide (CO_(2)) streams for the purposes of geological storage, including associated booster stations.
← anx_I__cpt_1__point_15__text_1 · All articles · anx_I__cpt_1__point_16__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-09-25 · Text as consolidated on 2014-05-15; changes after this date are not shown.