6. Extension and delay
Any delay in relation to the time limits set in Sections 1 to 4 in this Annex shall be reported by the working group to the organisation of TABs and to the Commission. If an extension of the time limits for developing the European Assessment Document can be justified, notably by the absence of a Commission decision on the applicable system of assessment and verification of constancy of performance for the construction product or by the need to develop a new test method, an extended time limit shall be set by the Commission.