anx_IX__cpt_1__cpt_2__text_4
The system boundary shall be set to include the planned installation and the heat loads, such as building(s) and industrial process. Within this system boundary the total cost of providing heat and power shall be determined for both cases and compared.
← anx_IX__cpt_1__cpt_2__text_3 · All articles · anx_IX__cpt_1__cpt_2__text_5 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-28 · Text as adopted (Official Journal); later amendments are not incorporated in this text.