6.
Member States may exempt from paragraph 5: those peak load and back-up electricity generating installations which are planned to operate under 1500 operating hours per year as a rolling average over a period of five years, based on a verification procedure established by the Member States ensuring that this exemption criterion is met; nuclear power installations; installations that need to be located close to a geological storage site approved under Directive 2009/31/EC. Member States may also lay down thresholds, expressed in terms of the amount of available useful waste heat, the demand for heat or the distances between industrial installations and district heating networks, for exempting individual installations from the provisions of points (c) and (d) of paragraph 5. Member States shall notify exemptions adopted under this paragraph to the Commission by 31 December 2013 and any subsequent changes to them thereafter.
← art_14__para_5__text_3 · All articles · art_14__para_6__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-28 · Text as adopted (Official Journal); later amendments are not incorporated in this text.