(c)
All delays shall be attributable to one of the following delay classes and sub-classes: Operation/planning management attributable to the infrastructure manager Timetable compilation Formation of train Mistakes in operations procedure Wrong application of priority rules Staff Other causes Infrastructure installations attributable to the infrastructure manager Signalling installations Signalling installations at level crossings Telecommunications installations Power supply equipment Track Structures Staff Other causes Civil engineering causes attributable to the infrastructure manager Planned construction work Irregularities in execution of construction work Speed restriction due to defective track Other causes Causes attributable to other infrastructure managers Caused by previous infrastructure manager Caused by next infrastructure manager Commercial causes attributable to the railway undertaking Exceeding the stop time Request of the railway undertaking Loading operations Loading irregularities Commercial preparation of train Staff Other causes Rolling stock attributable to the railway undertaking Roster planning/rerostering Formation of train by railway undertaking Problems affecting coaches (passenger transport) Problems affecting wagons (freight transport) Problems affecting cars, locomotives and rail cars Staff Other causes Causes attributable to other railway undertakings Caused by next railway undertaking Caused by previous railway undertaking External causes attributable to neither infrastructure manager nor railway undertaking Strike Administrative formalities Outside influence Effects of weather and natural causes Delay due to external reasons on the next network Other causes Secondary causes attributable to neither infrastructure manager nor railway undertaking Dangerous incidents, accidents and hazards Track occupation caused by the lateness of the same train Track occupation caused by the lateness of another train Turn-around Connection Further investigation needed;
← anx_VI__cpt_1__point_2__point_b__text_1 · All articles · anx_VI__cpt_1__point_2__point_c__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-28 · Text as adopted (Official Journal); later amendments are not incorporated in this text.