art_32__para_4__text_1
The infrastructure charges for the use of railway corridors which are specified in Commission Decision 2009/561/EC Commission Decision 2009/561/EC of 22 July 2009 amending Decision 2006/679/EC as regards the implementation of the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European conventional rail system (OJ L 194, 25.7.2009, p. 60). shall be differentiated to give incentives to equip trains with the ETCS compliant with the version adopted by the Commission Decision 2008/386/EC Commission Decision 2008/386/EC of 23 April 2008 modifying Annex A to Decision 2006/679/EC concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European conventional rail system and Annex A to Decision 2006/860/EC concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European high-speed rail system (OJ L 136, 24.5.2008, p. 11). and successive versions. Such differentiation shall not result in any overall change in revenue for the infrastructure manager.
← 4. · All articles · art_32__para_4__text_2 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-28 · Text as adopted (Official Journal); later amendments are not incorporated in this text.