lexiara

(4)

information on the well work programme, including the period of its operation, details and verification of barriers against loss of well control (equipment, drilling fluids and cement etc.), directional control of the well path, and limitations on safe operations in keeping with the risk management;

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-12 · Text as adopted (Official Journal); later amendments are not incorporated in this text.