Design and construction
On one or several watercrafts representing the production of the manufacturer one or more of the following tests, equivalent calculation or control shall be carried out by the manufacturer or on his behalf: test of stability in accordance with point 3.2 of Part A of Annex I; test of buoyancy characteristics in accordance with point 3.3 of Part A of Annex I.
← SUPPLEMENTARY REQUIREMENTS WHEN INTERNAL PRODUCTION CONTROL PLUS SUPERVISED PRODUCTION TESTS SET OUT IN MODULE A1 IS USED (ARTICLE 24(2)) · All articles · anx_VI__cpt_1__cpt_1__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-05 · Text as adopted (Official Journal); later amendments are not incorporated in this text.