lexiara

1.

For their control areas TSOs shall calculate and provide to the ENTSO for Electricity: the planned unavailability, including changes in the planned unavailability of interconnections and in the transmission grid that reduce cross zonal capacities between bidding zones by 100 MW or more during at least one market time unit, specifying: the identification of the assets concerned, the location, the type of asset, the estimated impact on cross zonal capacity per direction between bidding zones, reasons for the unavailability, the estimated start and end date (day, hour) of the change in availability; changes in the actual availability of interconnections and in the transmission grid that reduce cross zonal capacities between bidding zones by 100 MW or more during at least one market time unit, specifying: the identification of the assets concerned, the location, the type of asset, the estimated impact on cross zonal capacity per direction between bidding zones, reasons for the unavailability, the start and estimated end date (day, hour) of the change in availability; changes in the actual availability of off-shore grid infrastructure that reduce wind power feed-in by 100 MW or more during at least one market time unit, specifying: the identification of the assets concerned, the location, the type of asset, the installed wind power generation capacity (MW) connected to the asset, wind power fed in (MW) at the time of the change in the availability, reasons for the unavailability, the start and estimated end date (day, hour) of the change in availability.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.