art_10__para_1__point_c__text_2
the identification of the assets concerned, the location, the type of asset, the installed wind power generation capacity (MW) connected to the asset, wind power fed in (MW) at the time of the change in the availability, reasons for the unavailability, the start and estimated end date (day, hour) of the change in availability.