(c)
CRR
for electric power, the underlying is similar if the delivery rights and obligations refer to the same peak or off-peak load time interval within any 24-hour interval;
← art_282__para_4__point_b__text_1 · All articles · art_282__para_4__point_c__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-09-25 · Text as adopted (Official Journal); later amendments are not incorporated in this text.