Article 340 › 5
CRR
The institution shall then calculate the duration-weighted position for each instrument by multiplying its market price by its modified duration and by the assumed interest-rate change for an instrument with that particular modified duration (see column 3 in Table 3).
← 4 · All articles · 6 →
Source: EUR-Lex CELLAR · retrieved 2026-09-04