CHAPTER II
The following minimum conditions shall apply: at least three legal entities shall participate in an action; three legal entities shall each be established in a different Member State or associated country; and the three legal entities referred to in point (b) shall be independent of each other within the meaning of Article 8. For the purposes of paragraph 1, where one of the participants is the JRC, or an international European interest organisation or an entity created under Union law, it shall be deemed to be established in a Member State or associated country other than any Member State or associated country in which another participant in the same action is established. By way of derogation from paragraph 1, the minimum condition shall be the participation of one legal entity established in a Member State or associated country, in the case of: European Research Council (ERC) frontier research actions; the SME instrument, where the action has a clear European added value; programme co-fund actions; and justified cases provided for in the work programme or work plan. By way of derogation from paragraph 1, in the case of coordination and support actions and training and mobility actions, the minimum condition shall be the participation of one legal entity. Where appropriate and duly justified, work programmes or work plans may provide for additional conditions according to specific policy requirements or to the nature and objectives of the action, including inter alia conditions regarding the number of participants, the type of participant and the place of establishment. The following participants are eligible for funding from the Union: any legal entity established in a Member State or associated country, or created under Union law; any international European interest organisation; any legal entity established in a third country identified in the work programme. In the case of a participating international organisation or in the case of a participating legal entity established in a third country, neither of which are eligible for funding according to paragraph 1, funding from the Union may be granted provided that at least one of the following conditions is fulfilled: the participation is deemed essential for carrying out the action by the Commission or the relevant funding body; such funding is provided for under a bilateral scientific and technological agreement or any other arrangement between the Union and the international organisation or, for entities established in third countries, the country in which the legal entity is established. Calls for proposals shall be issued in accordance with Regulation (EU, Euratom) No 966/2012 and Regulation (EU) No 1268/12, taking account in particular of the need for transparency and non-discrimination, and for flexibility appropriate to the diverse nature of the research and innovation sectors. As an exception and without prejudice to the other cases provided for in Regulation (EU, Euratom) No 966/2012 and Regulation (EU) No 1268/2012, calls for proposals shall not be issued for coordination and support actions and programme co-fund actions to be carried out by legal entities identified in the work programmes or work plans provided that the action does not fall within the scope of a call for proposals. In accordance with the relevant rules of Regulation (EU, Euratom) No 966/2012 and Regulation (EU) No 1268/2012, sufficient time periods for preparing proposals shall be provided, with reasonable notice of upcoming calls for proposals through the publication of a work programme and a reasonable time period between the publication of a call for proposals and the deadline for submitting a proposal. Joint calls for proposals with third countries or their scientific and technological organisations and agencies or with international organisations may be issued to jointly fund actions in priority areas of common interest and expected mutual benefit where there is a clear added value for the Union. Proposals shall be evaluated and selected through joint evaluation and selection procedures to be agreed upon. Such evaluation and selection procedures shall ensure compliance with the principles set out in Title VI of Regulation (EU, Euratom) No 966/2012 and involve a balanced group of independent experts appointed by each party. Legal entities receiving funding from the Union shall conclude a grant agreement with the Union or the relevant funding body. That grant agreement shall include a description of the work to be done by those participants and by the participating legal entities from the third countries involved. Legal entities receiving funding from the Union shall conclude a coordination agreement with the participating legal entities receiving funding from the relevant third countries or international organisations. Proposals shall include a draft plan for the exploitation and dissemination of the results, where provided for in the work programme or work plan. Any proposal for research on human embryonic stem cells shall include, as appropriate, details of licensing and control measures that will be taken by the competent authorities of the Member States concerned as well as details of the ethical approvals that will be provided. As regards the derivation of human embryonic stem cells, institutions, organisations and researchers shall be subject to strict licensing and control in accordance with the legal framework of the Member States concerned. A proposal which contravenes ethical principles or any applicable legislation, or which does not fulfil the conditions set out in Decision No 2013/743/EU, in the work programme, in the work plan or in the call for proposals may be excluded from the evaluation, selection and award procedures at any time. Where relevant and specified in the work programme or the work plan, proposals shall explain how and to what extent gender analysis is relevant to the content of the intended project. The Commission shall systematically carry out ethics reviews for proposals raising ethical issues. That review shall verify the respect of ethical principles and legislation and, in the case of research carried out outside the Union, that the same research would have been allowed in a Member State. The Commission shall make the process of the ethics review as transparent as possible and ensure that it is carried out in a timely manner avoiding, where possible, the resubmission of documents. The proposals submitted shall be evaluated on the basis of the following award criteria: excellence; impact; quality and efficiency of the implementation. Only the criterion referred to in point (a) of paragraph 1 shall apply to proposals for ERC frontier research actions. The criterion referred to in point (b) of paragraph 1 may be given a higher weighting for proposals for innovation actions. The work programme or work plan shall lay down further details of the application of the award criteria laid down in paragraph 1, and specify weightings and thresholds. The Commission shall take into account the possibility of a two-stage submission procedure provided for in Regulation (EU, Euratom) No 966/2012 and Regulation (EU) No 1268/2012, where appropriate and consistent with the objectives of the call for proposals. Proposals shall be ranked according to the evaluation results. The selection shall be made on the basis of that ranking. The evaluation shall be carried out by independent experts. In the case of a legal entity referred to in Article 11(2) or in other duly justified exceptional circumstances, the evaluation may be carried out in a manner derogating from paragraph 7. In each case of such evaluation the Commission shall provide the Member States with detailed information on the evaluation procedure used and its outcome. In cases where the requested funding from the Union for the action is equal or superior to EUR 500000, the Commission or the relevant funding body shall, by means compatible with national law, verify in advance the financial capacity of only the coordinators. Furthermore, whenever there are grounds to doubt the financial capacity of the coordinator or other participants on the basis of available information, the Commission or the relevant funding body shall verify their financial capacity. The financial capacity shall not be verified either in respect of legal entities whose viability is guaranteed by a Member State or an associated country or in respect of higher and secondary education establishments. Financial capacity may be guaranteed by any other legal entity, whose financial capacity shall in turn be verified in accordance with paragraph 9. The Commission or the relevant funding body shall provide a transparent evaluation review procedure for applicants which consider that the evaluation of their proposal has not been carried out in accordance with the procedures set out in this Regulation, the relevant work programme, work plan or the call for proposals. A request for review shall relate to a specific proposal, and shall be submitted by the coordinator of the proposal within 30 days of the date on which the Commission or the relevant funding body informs the coordinator of the evaluation results. The Commission or the relevant funding body shall be responsible for the examination of the request referred to in paragraph 2. The examination shall cover only the procedural aspects of the evaluation, and not the merits of the proposal. An evaluation review committee composed of Commission staff or of staff of the relevant funding body shall provide an opinion on the procedural aspects of the evaluation process. It shall be chaired by an official of the Commission or of the relevant funding body, from a department other than that responsible for the call for proposals. The committee may recommend one of the following: re-evaluation of the proposal primarily by evaluators not involved in the previous evaluation; confirmation of the initial evaluation. On the basis of the recommendation referred to in paragraph 4, a decision shall be taken by the Commission or the relevant funding body and notified to the coordinator of the proposal. The Commission or the relevant funding body shall take such decision without undue delay. The review procedure shall not delay the selection process of proposals which are not the subject of requests for review. The review procedure shall not preclude any other actions the participant may take in accordance with Union law. The Commission shall ensure the existence of a procedure for participants to make enquiries or complaints about their involvement in Horizon 2020. The Commission shall ensure that information on how to register concerns, enquiries or complaints is made available to all participants and is published on-line. The Commission shall, in close cooperation with the Member States, draw up model grant agreements between the Commission or the relevant funding body and the participants in accordance with this Regulation. If a significant modification of a model grant agreement is required, the Commission shall, in close cooperation with the Member States, revise it as appropriate. The Commission or the relevant funding body shall enter into a grant agreement with the participants. The removal or substitution of an entity before signature of the grant agreement shall be duly justified. The grant agreement shall establish the rights and obligations of the participants and of either the Commission or the relevant funding body in compliance with this Regulation. It shall also establish the rights and obligations of legal entities which become participants during the implementation of the action, as well as the role and tasks of a consortium coordinator. On the basis of a requirement in a work programme or work plan, the grant agreement may establish rights and obligations of the participants with regard to access rights, exploitation and dissemination, in addition to those laid down in this Regulation. The grant agreement shall, where appropriate and to the extent possible, reflect the general principles laid down in the Commission Recommendation on the European Charter for Researchers and the Code of Conduct for the Recruitment of Researchers, principles of research integrity, the Commission Recommendation on the management of intellectual property in knowledge transfer activities, the Code of Practice for universities and other public research institutions as well as the gender equality principle laid down in Article 16 of Regulation (EU) No 1291/2013. The grant agreement shall, where appropriate, contain provisions ensuring the respect of ethical principles, including the establishment of an independent ethics board and the right of the Commission to carry out an ethics audit by independent experts. In duly justified cases, specific grants for actions may form part of a framework partnership in accordance with Regulation (EU, Euratom) No 966/2012 and Regulation (EU) No 1268/2012. Where appropriate, and in duly justified cases, the Commission, in accordance with Article 121(1) of Regulation (EU, Euratom) No 966/2012, or the relevant funding body, may notify grant decisions instead of entering into grant agreements. The provisions of this Regulation referring to grant agreements shall apply mutatis mutandis. In accordance with Article 128(2) of Regulation (EU, Euratom) No 966/2012, calls for proposals shall specify the planned date by which all applicants shall be informed of the outcome of the evaluation of their application and the indicative date for the signature of grant agreements or the notification of grant decisions. The dates referred to in paragraph 1 shall be based on the following periods: for informing all applicants of the outcome of the scientific evaluation of their application, a maximum period of five months from the final date for submission of complete proposals; for signing grant agreements with applicants or notifying grant decisions to them, a maximum period of three months from the date of informing applicants they have been successful. The periods referred to in paragraph 2 may be exceeded for actions of the ERC and in exceptional, duly justified cases, in particular where actions are complex, where there is a large number of proposals or where requested by the applicants. Participants shall be given reasonable time to submit the information and documentation required for the signature of the grant agreement. The Commission shall make decisions and requests for information as promptly as possible. Where possible, resubmission of documents shall be avoided. Participants shall be paid in a timely manner in accordance with Regulation (EU, Euratom) No 966/2012. When a payment has been made to the coordinator, the Commission or the relevant funding body shall notify the participants thereof. All exchanges with participants, including the conclusion of grant agreements, the notification of grant decisions and any amendments thereto, may be made through an electronic exchange system set up by the Commission or by the relevant funding body, as stipulated in Article 179 of Regulation (EU) No 1268/2012. Participants shall implement actions in compliance with all the conditions and obligations set out in this Regulation, Regulation (EU, Euratom) No 966/2012, Regulation (EU) No 1268/2012, Decision 2013/743/EU, the work programme or work plan, the call for proposals and the grant agreement. Participants shall make no commitments which are incompatible with this Regulation or the grant agreement. Where a participant fails to comply with its obligations regarding the technical implementation of the action, the other participants shall comply with the obligations without any additional Union funding unless the Commission or the relevant funding body expressly relieves them of that obligation. In the event of a participant defaulting, the Commission may, in accordance with point (a) of Article 39(3) transfer the amount due from the Participant Guarantee Fund referred to in Article 38 to the coordinator of the action. The financial responsibility of each participant shall be limited to its own debt subject to the provisions relating to the Participant Guarantee Fund. Participants shall ensure that the Commission or the relevant funding body is informed in due time of any event which might significantly affect the implementation of the action or the interests of the Union. Participants shall implement the action and shall take all necessary and reasonable measures to that end. They shall have the appropriate resources as and when needed for carrying out the action. Where it is necessary for the implementation of the action, they may call upon third parties, including subcontractors, to carry out work under the action or may use resources made available by third parties by means of contributions in kind, according to the conditions set out in the grant agreement. Participants shall retain responsibility towards the Commission or the relevant funding body and towards the other participants for the work carried out. The award of subcontracts for carrying out certain elements of the action shall be limited to the cases provided for in the grant agreement and to duly justified cases that could not be clearly foreseen at the time of entry into force of the grant agreement. Third parties other than subcontractors may carry out work under the action under the conditions laid down in the grant agreement. The third party and the work to be carried out by it shall be identified in the grant agreement. Costs incurred by those third parties may be deemed eligible if the third party meets all the following conditions: it would be eligible for funding if it were a participant; it is an affiliated entity or has a legal link to a participant implying a collaboration not limited to the action; it is identified in the grant agreement; it abides by the rules applicable to the participant under the grant agreement with regard to eligibility of costs and control of expenditure; it accepts joint and several liability with the participant for the Union contribution corresponding to the amount declared by the third party, if required by the Commission or the relevant funding body. Third parties may also make available resources to a participant by means of contributions in kind to the action. Costs incurred by third parties in relation to such contributions which are made free of charge are eligible for funding provided they meet the conditions established in the grant agreement. The action may involve financial support to third parties under the conditions established in Regulation (EU, Euratom) No 966/2012 and Regulation (EU) No 1268/2012. The amounts referred to in point (c) of Article 137(1) of Regulation (EU, Euratom) No 966/2012 may be exceeded where it is necessary to achieve the objectives of an action. The action carried out by participants which are contracting authorities within the meaning of Directive 2004/17/EC of the European Parliament and of the Council Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the procurement procedures of entities operating in the water, energy, transport and postal services sectors (OJ L 134, 30.4.2004, p. 1). , Directive 2004/18/EC of the European Parliament and of the Council Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public works contracts, public supply contracts and public service contracts (OJ L 134, 30.4.2004, p. 114). and Directive 2009/81/EC of the European Parliament and of the Council Directive 2009/81/EC of the European Parliament and of the Council of 13 July 2009 on the coordination of procedures for the award of certain works contracts, supply contracts and service contracts by contracting authorities or entities in the fields of defence and security, and amending Directives 2004/17/EC and 2004/18/EC (OJ L 216, 20.8.2009, p. 76). may involve or have as their primary aim the pre-commercial procurement and procurement of innovative solutions, where provided for in a work programme or a work plan and required for its implementation. In such cases, the rules set out in Article 51(2), (4) and (5) of this Regulation shall apply to the procurement procedures carried out by the participants. Participants shall comply with national legislation, regulations and ethical rules in the countries where the action will be carried out. Where appropriate, participants shall seek the approval of the relevant national or local ethics committees prior to the start of the action. Work using animals shall be carried out in accordance with Article 13 TFEU and shall comply with the requirement to replace, reduce and refine the use of animals for scientific purposes in accordance with Union law and in particular with Directive 2010/63/EU of the European Parliament and of the Council Directive 2010/63/EU of the European Parliament and of the Council of 22 September 2010 on the protection of animals used for scientific purposes (OJ L 276, 20.10.2010, p. 33). . The members of any consortium wishing to participate in an action shall appoint one of them to act as coordinator, which shall be identified in the grant agreement. The coordinator shall be the principal point of contact between the members of the consortium in relations with the Commission or the relevant funding body, unless specified otherwise in the grant agreement, or in the event of non-compliance with its obligations under the grant agreement. The members of a consortium participating in an action shall conclude an internal agreement ("the consortium agreement") establishing their rights and obligations with respect to the implementation of the action in compliance with the grant agreement, except in duly justified cases provided for in the work programme or work plan or call for proposals. The Commission shall publish guidelines on the main issues that may be addressed by participants in the consortium agreement. The consortium agreement may stipulate inter alia the following: the internal organisation of the consortium; the distribution of the Union funding; rules on dissemination, use and access rights, additional to those in Title III, Chapter I of this Regulation, and to the provisions in the grant agreement; arrangements for settling internal disputes; liability, indemnification and confidentiality arrangements between the participants. The members of the consortium may make any arrangements in the consortium they deem fit to the extent that those arrangements are not in conflict with the grant agreement or this Regulation. The consortium may propose to add or remove a participant or change the coordinator in accordance with the relevant provisions of the grant agreement, provided that the change is in conformity with the conditions for participation, does not adversely affect the implementation of the action and is not contrary to the principle of equal treatment. Grants may take any of the forms provided for in Article 123 of Regulation (EU, Euratom) No 966/2012, taking into account the objectives of the action. Conditions for eligibility of costs are defined in Article 126 of Regulation (EU, Euratom) No 966/2012. Costs incurred by third parties under the action may be eligible according to the provisions of this Regulation and of the grant agreement. Ineligible costs are those not complying with the conditions of paragraph 1, including, in particular, provisions for possible future losses or charges, exchange losses, costs related to return on capital, costs reimbursed in respect of another Union action or programme, debt and debt service charges and excessive or reckless expenditure. Without prejudice to the conditions laid down in Article 26, direct eligible personnel costs shall be limited to salaries plus social security charges and other costs included in the remuneration of personnel assigned to the action, arising from national law or from the employment contract. Without prejudice to the conditions laid down in Article 26, additional remuneration to personnel of participants that are non-profit legal entities assigned to the action, including payments on the basis of supplementary contracts regardless of their nature, may also be considered as direct eligible personnel costs, up to the amount set out in paragraph 3, if they fulfil the following additional conditions: it is part of the usual remuneration practices of the participant and is paid in a consistent manner whenever the same kind of work or expertise is required; the criteria used to calculate the supplementary payments are objective and of general application by the participant, independent of the source of funding used. Additional remuneration may be eligible up to EUR 8000 per year and per person. In relation to a person not working exclusively for the action, a limit per hour shall apply. The limit per hour shall be calculated by dividing EUR 8000 by the number of annual productive hours calculated in accordance with Article 31. The funding of an action shall not exceed the total eligible costs minus the receipts of the action. The following shall be considered as receipts of the action: resources made available by third parties to the participants by means of financial transfers or contributions in kind free of charge, the value of which has been declared as eligible costs by the participant, provided that they have been contributed by the third party specifically to be used in the action; income generated by the action, except income generated by the exploitation of the results of the action; income generated from the sale of assets purchased under the grant agreement up to the value of the cost initially charged to the action by the participant. A single reimbursement rate of the eligible costs shall be applied per action for all activities funded therein. The maximum rate shall be fixed in the work programme or work plan. The Horizon 2020 grant may reach a maximum of 100 % of the total eligible costs, without prejudice to the co-financing principle. The Horizon 2020 grant shall be limited to a maximum of 70 % of the total eligible costs for innovation actions and programme co-fund actions. By way of derogation from paragraph 3, the Horizon 2020 grant may, for innovation actions, reach a maximum of 100 % of the total eligible costs for non-profit legal entities, without prejudice to the co-financing principle. The reimbursement rates determined in this Article shall also apply in the case of actions where flat rate, unit or lump-sum financing is fixed for the whole or part of the action. Indirect eligible costs shall be determined by applying a flat rate of 25 % of the total direct eligible costs, excluding direct eligible costs for subcontracting and the costs of resources made available by third parties which are not used on the premises of the beneficiary, as well as financial support to third parties. By way of derogation from paragraph 1, indirect costs may be declared in the form of a lump sum or unit costs when provided for in the work programme or work plan. The interim evaluation of Horizon 2020 shall include an evaluation of the impact of the various features introduced by the new funding levels laid down in Articles 27, 28 and 29 of this Regulation, with the aim of evaluating whether the new approach has led to undesired situations adversely affecting the attractiveness of Horizon 2020. Eligible personnel costs shall cover only the actual hours worked by the persons directly carrying out work under the action. Evidence regarding the actual hours worked shall be provided by the participant, usually through a time recording system. For persons working exclusively for the action, no time recording is required. In such cases, the participant shall sign a declaration confirming that the person concerned has worked exclusively for the action. The grant agreement shall contain: the minimum requirements for the time recording system; the option to choose between a fixed number of annual productive hours and the method for establishing the number of annual productive hours to be used for the calculation of the hourly personnel rates, taking account of the participant's usual accounting practices. The owners of SMEs who do not receive a salary, and other natural persons who do not receive a salary, may charge personnel costs on the basis of a unit cost. In accordance with Article 124 of Regulation (EU, Euratom) No 966/2012, the Commission may establish methods to determine unit costs based on: statistical data or similar objective means; auditable historical data of the participant. Direct eligible personnel costs may be financed on the basis of unit costs determined according to the participant's usual cost accounting practices, provided that they comply with the following cumulative criteria: they are calculated on the basis of the total actual personnel costs recorded in the participant's general accounts which may be adjusted by the participant on the basis of budgeted or estimated elements according to the conditions defined by the Commission; they comply with Articles 26 and 27; they ensure compliance with the non-profit requirement and the avoidance of double funding of costs; they are calculated with due regard to Article 31. The certificate on the financial statements shall cover the total amount of the grant claimed by a participant under the form of reimbursement of actual costs and under the form of unit costs referred to in Article 33(2), excluding the amounts declared on the basis of lump sums, flat rates and unit costs other than those determined according to the participant's usual cost accounting practices. The certificate shall be submitted only when that amount is equal to or greater than EUR 325000 at the time of claiming the payment of the balance of the grant. Participants that calculate and claim direct personnel costs on the basis of unit costs in accordance with Article 33(2) may submit to the Commission a certificate on the methodology. That methodology shall comply with the conditions set out in Article 33(2) and meet the requirements of the grant agreement. Where the Commission accepts a certificate on the methodology, it shall be valid for all actions financed under Regulation (EU) No 1291/2013 and the participant shall calculate and claim costs on the basis of it. Once the Commission has accepted a certificate on the methodology, it shall not attribute any systemic or recurrent error to the accepted methodology. The certificates on the financial statements and on the methodology referred to in Articles 34 and 35 shall be established by an independent auditor qualified to carry out statutory audits of accounting documents in accordance with Directive 2006/43/EC of the European Parliament and of the Council Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of annual accounts and consolidated accounts, amending Council Directives 78/660/EEC and 83/349/EEC and repealing Council Directive 84/253/EEC (OJ L 157, 9.6.2006, p. 87). or similar national regulations, or by a competent and independent public officer in whom the relevant national authorities have vested the legal capacity to audit the participant and who has not been involved in the preparation of the financial statements. Upon request by the Commission, the Court of Auditors or the European Anti-fraud Office (OLAF), the auditor who delivers the certificate on the financial statements and on the methodology shall grant access to the supporting documents and audit working papers on the basis of which a certificate on the financial statements or on the methodology was issued. An action for which a grant from the Union budget has been awarded may also give rise to the award of a grant on the basis of Regulation (EU) No 1291/2013, provided that the grants do not cover the same cost items. A participant guarantee fund (the "Fund") is hereby established and shall cover the risk associated with non-recovery of sums due to the Union under actions financed through grants by the Commission under Decision No 1982/2006/EC and by the Commission or Union funding bodies under "Horizon 2020" according to the rules set out in this Regulation. The Fund shall replace and succeed the Participant Guarantee Fund set up under Regulation (EC) No 1906/2006. The Fund shall be operated in accordance with Article 39. Any financial interest generated by the Fund shall be added to the Fund and shall serve exclusively for the purposes set out in Article 39(3). Where interest is insufficient to cover the operations described in Article 39(3), the Fund shall not intervene and the Commission or the relevant Union funding body shall recover directly from participants or third parties any amount owed. The Fund shall be considered a sufficient guarantee under Regulation (EU, Euratom) No 966/2012. No additional guarantee or security may be accepted from participants or imposed upon them except in the case described in paragraph 3 of this Article. Participants in actions under Horizon 2020 whose risk is covered by the Fund shall make a contribution of 5 % of the Union funding for the action. At the end of the action the amount contributed to the Fund shall be returned to the participants, via the coordinator. The rate of the participants' contribution to the Fund set out in paragraph 5 may be reduced on the basis of the interim evaluation of Horizon 2020. The Fund shall be managed by the Union, represented by the Commission acting as executive agent on behalf of the participants, in accordance with the conditions established by the grant agreement. The Commission may manage the Fund directly or entrust the financial management of the Fund either to the European Investment Bank or to an appropriate financial institution ("the depository bank"). The depository bank shall manage the Fund pursuant to the instructions of the Commission. The participants' contribution to the Fund may be offset from the initial pre-financing and be paid to the Fund on behalf of the participants. Where amounts are due to the Union by a participant, the Commission may, without prejudice to penalties which may be imposed on the defaulting participant, take either of the following actions: transfer, or order the depository bank to transfer, directly the amount due from the Fund to the coordinator of the action. That transfer shall be made after the termination or withdrawal of the participation of the defaulting participant if the action is still ongoing and if the remaining participants agree to implement it according to the same objectives. Amounts transferred from the Fund shall be regarded as Union funding; recover effectively that amount from the Fund. The Commission shall issue a recovery order against that participant or third party to the benefit of the Fund. The Commission may adopt to that end a recovery decision in accordance with Regulation (EU, Euratom) No 966/2012. The amounts recovered shall constitute revenue assigned to the Fund within the meaning of Article 21(4) of Regulation (EU, Euratom) No 966/2012. Once the implementation of all grants whose risk is covered by the Fund is complete, any sums outstanding shall be recovered by the Commission and entered into the budget of the Union, subject to decisions of the legislative authority.
← art_8__para_3__point_b__text_1 · All articles · Section I →
Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.