lexiara

(b)

for additional works or services by the original concessionaire that have become necessary and that were not included in the initial concession where a change of concessionaire: cannot be made for economic or technical reasons such as requirements of interchangeability or interoperability with existing equipment, services or installations procured under the initial concession; and would cause significant inconvenience or substantial duplication of costs for the contracting authority or contracting entity. However, in the case of concessions awarded by a contracting authority, for the purposes of pursuing an activity other than those referred to in Annex II, any increase in value shall not exceed 50 % of the value of the original concession. Where several successive modifications are made, that limitation shall apply to the value of each modification. Such consecutive modifications shall not be aimed at circumventing this Directive;

· All articles ·

Source: EUR-Lex CELLAR · retrieved 2026-09-04 · Text as consolidated on 2026-01-01; changes after this date are not shown.