lexiara

Article 66 › 2

Where tenders can be made only after a visit to the site or after on-the-spot inspection of the documents supporting the procurement documents, the time limits for the receipt of tenders, which shall be longer than the minimum time limits set out in Articles 45 to 49, shall be fixed, so that all economic operators concerned may be aware of all the information needed to produce tenders.

· All articles ·

Source: EUR-Lex CELLAR · retrieved 2026-09-04