Article 9 › 2
The supply, by a contracting entity other than a contracting authority, of electricity to fixed networks which provide a service to the public shall not be considered to be a relevant activity within the meaning of paragraph 1 where all of the following conditions are met: (a) the production of electricity by that contracting entity takes place because its consumption is necessary for carrying out an activity other than those referred to in paragraph 1 of this Article or in Articles 8, 10 and 11; (b) supply to the public network depends only on that contracting entity’s own consumption and has not exceeded 30 % of that contracting entity’s total production of energy, on the basis of the average for the preceding three years, including the current year.
← 1 · All articles · 10 →
Source: EUR-Lex CELLAR · retrieved 2026-09-04