4.3. Permissible effect of transient electromagnetic phenomena
The effect of an electromagnetic disturbance on an electrical energy meter shall be such that during and immediately after a disturbance: any output intended for testing the accuracy of the meter does not produce pulses or signals corresponding to an energy of more than the critical change value, and in reasonable time after the disturbance the meter shall: recover to operate within the MPE limits, and have all measurement functions safeguarded, and allow recovery of all measurement data present prior to the disturbance, and not indicate a change in the registered energy of more than the critical change value. The critical change value in kWh is m U_(n) I_(max) 10–6 (m being the number of measuring elements of the meter, U_(n) in Volts and I_(max) in Amps). For overcurrent the critical change value is 1,5 %.
← anx_V__cpt_3__cpt_4__cpt_2__table_1__row_9__cell_4 · All articles · 4.3.1. →
Source: EUR-Lex (Cellar) · retrieved 2026-11-06 · Text as adopted (Official Journal); later amendments are not incorporated in this text.