2. Obligations of the installer
The installer shall operate an approved quality system for the design, manufacture, assembly, installation, final inspection and testing of the lifts as specified in point 3, and shall be subject to surveillance as specified in point 4. The adequacy of the technical design of the lifts shall have been examined in accordance with point 3.3.
← anx_XI__cpt_1__cpt_1__text_2 · All articles · anx_XI__cpt_1__cpt_2__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-02 · Text as adopted (Official Journal); later amendments are not incorporated in this text.