2.
The technical report referred to in paragraph 1 second subparagraph point (a) shall include at least: a list of structural congestion and other major physical congestion, including locations and frequency; an analysis of the expected evolution or removal of physical congestion resulting from investment in networks or from significant changes in generation or in consumption patterns; an analysis of the share of power flows that do not result from the capacity allocation mechanism, for each capacity calculation region, where appropriate; congestion incomes and firmness costs; a scenario encompassing a ten year time-frame.
← art_34__para_1__point_b__text_1 · All articles · art_34__para_2__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-01 · Text as adopted (Official Journal); later amendments are not incorporated in this text.