(28) However, single day-ahead and intraday coupling should only be implemented stepwise, as the regulatory framework for electricity trade and the physical structure of the transmission grid are characterised by significant differences between Member States and regions. The introduction of single day-ahead and intraday coupling therefore requires a successive alignment of the existing methodologies on capacity calculation, allocation and congestion management. Single intraday and day-ahead coupling may therefore be introduced at a regional level as an intermediate step where necessary.