(4) To implement single day-ahead and intraday coupling, the available cross-border capacity needs to be calculated in a coordinated manner by the Transmission System Operators (hereinafter ‘TSOs’). For this purpose, they should establish a common grid model including estimates on generation, load and network status for each hour. The available capacity should normally be calculated according to the so-called flow-based calculation method, a method that takes into account that electricity can flow via different paths and optimises the available capacity in highly interdependent grids. The available cross-border capacity should be one of the key inputs into the further calculation process, in which all Union bids and offers, collected by power exchanges, are matched, taking into account available cross-border capacity in an economically optimal manner. Single day-ahead and intraday coupling ensures that power usually flows from low- price to high- price areas.
← rec_3 · All articles · rec_5 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-01 · Text as adopted (Official Journal); later amendments are not incorporated in this text.