2.3. Certificate of verification
2.3.1. The notified bodies responsible for the verification assess the design, production and final testing of the subsystem and draw up the certificate of verification intended for the applicant who in turn draws up the ‘EC’ declaration of verification. The certificate of verification must provide reference to the TSIs with which the conformity has been assessed. Where a subsystem has not been assessed for its conformity with all relevant TSI(s) (e.g. in the case of a derogation, partial application of TSIs for upgrade or renewal, transitional period in a TSI or specific case), the certificate of verification shall give the precise reference to the TSI(s) or their parts whose conformity has not been examined by the notified body during the verification procedure. 2.3.2. Where ISV have been issued, the notified body responsible for the verification of the subsystem takes these ISV into account, and, before issuing its certificate of verification: verifies that the ISV cover correctly the relevant requirements of the TSI(s); checks all aspects that are not covered by the ISV; and checks the final testing of the subsystem as a whole. 2.3.3. In the case of a modification to a subsystem already covered by a certificate of verification, the notified body shall perform only those examinations and tests that are relevant and necessary, i.e. assessment shall relate only to the parts of the subsystem that are changed and their interfaces to the unchanged parts of the subsystem. 2.3.4 Each notified body involved in the verification of a subsystem shall draw up a file in accordance with Article 15(4) covering the scope of its activities.
← anx_IV__cpt_2__cpt_2__cpt_3__text_2 · All articles · anx_IV__cpt_2__cpt_3__cpt_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-12 · Text as adopted (Official Journal); later amendments are not incorporated in this text.