2.5. Surveillance by notified bodies.

2.5.1. The notified body responsible for checking production must have permanent access to building sites, production workshops, storage areas and, where appropriate, prefabrication or testing facilities and, more generally, to all premises which it considers necessary for its task. The notified body must receive from the applicant all the documents needed for that purpose and, in particular, the implementation plans and technical documentation concerning the subsystem. 2.5.2. The notified body responsible for checking implementation must periodically carry out audits in order to confirm compliance with the relevant TSI(s). It must provide those responsible for implementation with an audit report. Its presence may be required at certain stages of the building operations. 2.5.3. In addition, the notified body may pay unexpected visits to the worksite or to the production workshops. At the time of such visits the notified body may conduct complete or partial audits. It must provide those responsible for implementation with an inspection report and, if appropriate, an audit report. 2.5.4. The notified body shall be able to monitor a subsystem on which an interoperability constituent is mounted in order to assess, where required by the corresponding TSI, its suitability for use in its intended railway environment.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-12 · Text as adopted (Official Journal); later amendments are not incorporated in this text.