lexiara

3.

The task of the notified body responsible for the ‘EC’ verification of a subsystem shall begin at the design stage and cover the entire manufacturing period through to the acceptance stage before the subsystem is placed on the market or in service. It shall, in accordance with the relevant TSI, also cover verification of the interfaces of the subsystem in question with the system into which it is incorporated.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-12 · Text as adopted (Official Journal); later amendments are not incorporated in this text.