art_18__para_4__point_d__text_1
in the case of trackside control-command and signalling subsystems involving European Train Control System (ETCS) and/or Global System for Mobile Communications — Railway (GSM-R) equipment, the positive decision of the Agency issued in accordance with Article 19 of this Directive; and, in the case of a change to the draft tender specifications or to the description of the envisaged technical solutions that occurred after the positive decision, the compliance with the result of the procedure referred to in Article 30(2) of Regulation (EU) 2016/796.
← (d) · All articles · 5. →
Source: EUR-Lex (Cellar) · retrieved 2026-10-12 · Text as adopted (Official Journal); later amendments are not incorporated in this text.