lexiara

3.

To the extent necessary to achieve the objectives of this Directive referred to in Article 1, each TSI shall: indicate its intended scope (part of network or vehicles referred to in Annex I; subsystem or part of subsystem referred to in Annex II); lay down essential requirements for each subsystem concerned and its interfaces in relation to other subsystems; establish the functional and technical specifications to be met by the subsystem and its interfaces in relation to other subsystems. If necessary, these specifications may vary according to the use of the subsystem, for example according to the categories of line, hub and/or vehicles provided for in Annex I; determine the interoperability constituents and interfaces which must be covered by European specifications, including European standards, which are necessary to achieve interoperability within the Union rail system; state, in each case under consideration, which procedures are to be used in order to assess the conformity or the suitability for use of the interoperability constituents, on the one hand, or the ‘EC’ verification of the subsystems, on the other. Those procedures shall be based on the modules defined in Commission Decision 2010/713/EU Commission Decision 2010/713/EU of 9 November 2010 on modules for the procedures for assessment of conformity, suitability for use and ‘EC’ verification to be used in the technical specifications for interoperability adopted under Directive 2008/57/EC of the European Parliament and of the Council (OJ L 319, 4.12.2010, p. 1). ; indicate the strategy for the application of the TSI. In particular, it is necessary to specify the stages to be completed, taking into account the estimated costs and benefits and the expected repercussions for the stakeholders affected in order to make a gradual transition from the existing situation to the final situation in which compliance with the TSI shall be the norm. Where coordinated implementation of the TSI is necessary, such as along a corridor or between infrastructure managers and railway undertakings, the strategy may include proposals for staged completion; indicate, for the staff concerned, the professional qualifications and health and safety conditions at work required for the operation and maintenance of the above subsystem, as well as for the application of the TSIs; indicate the provisions applicable to the existing subsystems and vehicles, in particular in the event of upgrading and renewal and, in such cases, the modification work which requires an application for a new authorisation; indicate the parameters of the vehicles and fixed subsystems to be checked by the railway undertaking and the procedures to be applied to check those parameters after the delivery of the vehicle authorisation for placing on the market and before the first use of the vehicle to ensure compatibility between vehicles and the routes on which they are to be operated.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-12 · Text as adopted (Official Journal); later amendments are not incorporated in this text.