1.
Member States may allow the applicant not to apply one or more TSIs or parts of them in the following cases: for a proposed new subsystem or part of it, for the renewal or upgrading of an existing subsystem or part of it, or for any element referred to in Article 1(1) which is at an advanced stage of development or which is the subject of a contract in the course of performance on the date of application of the TSI(s) concerned; where, following an accident or a natural disaster, the conditions for the rapid restoration of the network do not economically or technically allow for partial or total application of the relevant TSIs, in which case the non-application of the TSIs shall be limited to the period before the restoration of the network; for any proposed renewal, extension or upgrading of an existing subsystem or part of it, when the application of the TSI(s) concerned would compromise the economic viability of the project and/or the compatibility of the rail system in the Member State concerned, for example in relation to the loading gauge, track gauge, space between tracks or electrification voltage; for vehicles arriving from or going to third countries the track gauge of which is different from that of the main rail network within the Union; for a proposed new subsystem or for the proposed renewal or upgrading of an existing subsystem in the territory of the Member State concerned when its rail network is separated or isolated by the sea or separated as a result of special geographical conditions from the rail network of the rest of the Union.
← Article 7 · All articles · art_7__para_1__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-12 · Text as adopted (Official Journal); later amendments are not incorporated in this text.