2.
Without prejudice to the responsibility of the railway undertakings and infrastructure managers for the safe operation of a train as provided for in Article 4, the entity in charge of maintenance shall ensure that the vehicles for the maintenance of which it is in charge are in a safe state of running. To that end, the entity in charge of maintenance shall establish a maintenance system for those vehicles and shall by means of that system: ensure that vehicles are maintained in accordance with the maintenance file of each vehicle and the requirements in force, including maintenance rules and relevant TSI provisions; implement the necessary risk evaluation and assessment methods established in the CSMs as referred to in point (a) of Article 6(1), where appropriate in cooperation with other actors; ensure that its contractors implement risk control measures through the application of the CSM on monitoring referred to in point (c) of Article 6(1) and that this is stipulated in contractual arrangements to be disclosed on request of the Agency or the national safety authority; and ensure the traceability of the maintenance activities.
← art_14__para_1__text_1 · All articles · art_14__para_2__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-28 · Text as adopted (Official Journal); later amendments are not incorporated in this text.