lexiara

1.

In preparation of a joint operation the executive director, in cooperation with the host Member State, shall draw up a list of technical equipment and staff needed taking into account the host Member State's available resources. On the basis of those elements, the Agency shall define a package of technical and operational reinforcement as well as capacity-building activities to be included in the operational plan.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-16 · Text as adopted (Official Journal); later amendments are not incorporated in this text.