Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (Text with EEA relevance. ) · European Union
The TSOs of the LFC areas constituting a LFC block shall have the right, if required, to define internal limits for the exchange of RR between LFC areas of the LFC block in the LFC block operational agreement as to: avoid internal congestions due to the activation of reserve capacity on RR subject to the exchange of RR; ensure an even distribution of RR throughout the synchronous area in case of network splitting; and avoid that the stability of the RRP or the operational security is affected.