anx_VII__table_1
Table Requirements and limits for the exchange of FRR within a synchronous area Synchronous area Exchange of FRR allowed between Limits for the exchange of FRR All synchronous areas consisting of more than one LFC block TSOs of different LFC blocks The TSOs of a LFC block shall ensure that at least 50 % of their total combined reserve capacity on FRR resulting from the FRR dimensioning rules in Article 157(1) and before any reduction due to the sharing of FRR in accordance with Article 157(2) remains located within their LFC block. TSOs of the LFC areas of the same LFC block The TSOs of the LFC areas constituting a LFC block shall have the right, if needed, to specify internal limits, for the exchange of FRR between the LFC areas of the LFC block in the LFC block operational agreement to: avoid internal congestions due to the activation of the reserve capacity on FRR subject to the exchange of FRR; ensure an even distribution of FRR throughout the synchronous area and LFC blocks in case of network splitting; avoid that the stability of the FRP or the operational security is affected.
← anx_VII__text_1 · All articles · anx_VII__table_1__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.