Article 107
Each TSO shall perform a control area adequacy analysis in a day-ahead and intraday time-frame on the basis of: schedules referred to in Article 111; forecasted load; forecasted generation from renewable energy sources; active power reserves in accordance with the data provided pursuant to Article 46(1)(a); control area import and export capacities consistent with cross-zonal capacities calculated where applicable in accordance with Article 14 of Regulation (EU) 2015/1222; capabilities of power generating modules in accordance with the data provided pursuant to Article 43(4) and Articles 45 and 51 and their availability statuses; and capabilities of demand facilities with demand response in accordance with the data provided pursuant to Articles 52 and 53 and their availability statuses. Each TSO shall evaluate: the minimum level of import and the maximum level of export compatible with its control area adequacy; the expected duration of a potential absence of adequacy; and the amount of energy not supplied in the absence of adequacy. Where, following the analysis in paragraph 1, adequacy is not fulfilled, each TSO shall notify the absence of adequacy to its regulatory authority or other competent authority. The TSO shall provide its regulatory authority or other competent authority with an analysis of the causes of the absence of adequacy and propose mitigating actions.
← art_106__para_3__text_1 · All articles · 1. →
Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.