2.
In order to increase the efficiency of operation of its transmission system elements, each TSO shall monitor: the available reactive power capacities of power generating facilities; the available reactive power capacities of transmission-connected demand facilities; the available reactive power capacities of DSOs; the available transmission-connected equipment dedicated to providing reactive power; and the ratios of active power and reactive power at the interface between the transmission system and transmission-connected distribution systems.
← art_109__para_1__text_1 · All articles · art_109__para_2__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.