lexiara

4.

Text with EEA relevance.

All TSOs of an LFC block shall have the right to determine in the LFC block operational agreement the following measures to support the fulfilment of the FRCE target parameter of the LFC block and to alleviate deterministic frequency deviations, taking into account the technological restrictions of power generating modules and demand units: obligations on ramping periods and/or maximum ramping rates for power generating modules and/or demand units; obligations on individual ramping starting times for power generating modules and/or demand units within the LFC block; and coordination of the ramping between power generating modules, demand units and active power consumption within the LFC block.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.