1.

Text with EEA relevance.

When specifying the process responsibility structure, all TSOs of each synchronous area shall take into account at least the following criteria: the size and the total inertia, including synthetic inertia, of the synchronous area; the grid structure and/or network topology; and the load, generation and HVDC behaviour.