4.
Text with EEA relevance.
Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (Text with EEA relevance. ) · European Union
TSOs shall implement the imbalance netting power interchange between LFC areas of a synchronous area in at least one of the following ways: by defining an active power flow over a virtual tie-line which shall be part of the FRCE calculation; by adjusting the active power flows over HVDC interconnectors.
← art_146__para_3__point_c__text_1 · All articles · art_146__para_4__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.