lexiara

4.

Text with EEA relevance.

TSOs shall implement the frequency restoration power interchange between LFC areas of the same synchronous area through one of the following actions: defining an active power flow over a virtual tie-line which shall be part of the FRCE calculation where FRR activation is automated; adjusting a control program or defining an active power flow over a virtual tie-line between LFC areas where FRR activation is manual; or adjusting the active power flows over HVDC interconnectors.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.