lexiara

4.

Text with EEA relevance.

TSOs shall implement the control program between LFC areas of the same synchronous area by carrying out at least one of the following actions: determining an active power flow over a virtual tie-line which shall be part of the FRCE calculation; adjusting a control program; or adjusting active power flows over HVDC interconnectors.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.