1.

Text with EEA relevance.

The FRR minimum technical requirements shall be the following: each FRR providing unit and each FRR providing group shall be connected to only one reserve connecting TSO; a FRR providing unit or FRR providing group shall activate FRR in accordance with the setpoint received from the reserve instructing TSO; the reserve instructing TSO shall be the reserve connecting TSO or a TSO designated by the reserve connecting TSO in an FRR exchange agreement pursuant to Article 165(3) or 171(4); a FRR providing unit or FRR providing group for automatic FRR shall have an automatic FRR activation delay not exceeding 30 seconds; a FRR provider shall ensure that the FRR activation of the FRR providing units within a reserve providing group can be monitored. For that purpose, the FRR provider shall be capable of supplying to the reserve connecting TSO and the reserve instructing TSO real-time measurements of the connection point or another point of interaction agreed with the reserve connecting TSO concerning: time-stamped scheduled active power output; time-stamped instantaneous active power for: each FRR providing unit, each FRR providing group, and each power generating module or demand unit of a FRR providing group with a maximum active power output larger than or equal to 1,5 MW; a FRR providing unit or FRR providing group for automatic FRR shall be capable of activating its complete automatic reserve capacity on FRR within the automatic FRR full activation time; a FRR providing unit or FRR providing group for manual FRR shall be capable of activating its complete manual reserve capacity on FRR within the manual FRR full activation time; a FRR provider shall fulfil the FRR availability requirements; and a FRR providing unit or FRR providing group shall fulfil the ramping rate requirements of the LFC block.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.