To coordinate their operational security analysis and to establish the common grid model in accordance with Articles 67, 68, 69 and 70, each TSO shall exchange, with at least all other TSOs from the same synchronous area, at least the following data: the topology of the 220 kV and higher voltage transmission systems within its control area; a model or an equivalent of the transmission system with voltage below 220 kV with significant impact on its own transmission system; the thermal limits of the transmission system elements; and a realistic and accurate forecasted aggregate amount of injection and withdrawal, per primary energy source, at each node of the transmission system, for different time-frames.