Each SGU which is a power generating facility owner of a type B, C or D power generating module connected to the transmission system shall provide the TSO with at least the following data: active power output and active power reserves amount and availability, on a day-ahead and intra-day basis; without any delay, any scheduled unavailability or active power restriction; any forecasted restriction in the reactive power control capability; and as an exception to points (a) and (b), in regions with a central dispatch system, data requested by the TSO for the preparation of its active power output schedule.