lexiara

1.

Text with EEA relevance.

Unless otherwise provided by the TSO, each power generating facility owner of a power generating module which is a SGU pursuant to Article 2(1)(a) and by aggregation of the SGUs pursuant to Article 2(1)(e) connected to the distribution system shall provide at least the following data to the TSO and to the DSO to which it has a connection point: general data of the power generating module, including installed capacity and primary energy source or fuel type; FCR data according to the definition and requirements of Article 173 for power generating facilities offering or providing the FCR service; FRR data for power generating facilities offering or providing the FRR service; RR data for power generating modules offering or providing the RR service; protection data; reactive power control capability; capability of remote access to the circuit breaker; data necessary for performing dynamic simulation according to the provisions in Regulation (EU) 2016/631; and voltage level and location of each power generating module.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.