lexiara

2.

Text with EEA relevance.

When defining its year-ahead individual grid model, each TSO shall: agree with the neighbouring TSOs upon the estimated power flow on HVDC systems linking their control areas; balance for each scenario the sum of: net exchanges on AC lines; estimated power flows on HVDC systems; load, including an estimation of losses; and generation.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.