3.
The proposals for the following terms and conditions or methodologies shall be subject to approval by all regulatory authorities of the concerned region, on which a Member State may provide an opinion to the concerned regulatory authority: methodology for each synchronous area for the definition of minimum inertia in accordance with Article 39(3)(b); common provisions for each capacity calculation region for regional operational security coordination in accordance with Article 76; methodology, at least per synchronous area, for assessing the relevance of assets for outage coordination in accordance with Article 84; methodologies, conditions and values included in the synchronous area operational agreements in Article 118 concerning: the frequency quality defining parameters and the frequency quality target parameter in accordance with Article 127; the dimensioning rules for FCR in accordance with Article 153; the additional properties of the FCR in accordance with Article 154(2); for the GB and IE/NI synchronous areas, the measures to ensure the recovery of energy reservoirs in accordance with Article 156(6)(b); for the CE and Nordic synchronous areas, the minimum activation period to be ensured by FCR providers in accordance with Article 156(10); for the CE and Nordic synchronous areas, the assumptions and methodology for a cost-benefit analysis in accordance with Article 156(11); for synchronous areas other than CE and if applicable, the limits for the exchange of FCR between TSOs in accordance with Article 163(2); for the GB and IE/NI synchronous areas, the methodology to determine the minimum provision of reserve capacity on FCR between synchronous areas, defined in accordance with Article 174(2)(b); limits on the amount of exchange of FRR between synchronous areas defined in accordance with Article 176(1) and limits on the amount of sharing of FRR between synchronous areas defined in accordance with Article 177(1); limits on the amount of exchange of RR between synchronous areas defined in accordance with Article 178(1) and limits on the amount of sharing of RR between synchronous areas defined in accordance with Article 179(1); methodologies and conditions included in the LFC block operational agreements in Article 119, concerning: ramping restrictions for active power output in accordance with Article 137(3) and (4); coordination actions aiming to reduce FRCE as defined in Article 152(14); measures to reduce FRCE by requiring changes in the active power production or consumption of power generating modules and demand units in accordance with Article 152(16); the FRR dimensioning rules in accordance with Article 157(1); mitigation measures per synchronous area or LFC block in accordance with Article 138; common proposal per synchronous area for the determination of LFC blocks in accordance with Article 141(2).
← art_6__para_2__point_c__text_1 · All articles · art_6__para_3__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.