4.
Unless determined otherwise by the Member State, the following terms and conditions or methodologies shall be subject to individual approval by the entity designated in accordance with paragraph 1 by the Member State: for the GB and IE/NI synchronous areas, the proposal of each TSO specifying the level of demand loss at which the transmission system shall be in the blackout state; scope of data exchange with DSOs and significant grid users in accordance with Article 40(5); additional requirements for FCR providing groups in accordance with Article 154(3); exclusion of FCR providing groups from the provision of FCR in accordance with Article 154(4); for the CE and Nordic synchronous areas, the proposal concerning the interim minimum activation period to be ensured by FCR providers as proposed by the TSO in accordance with Article 156(9); FRR technical requirements defined by the TSO in accordance with Article 158(3); rejection of FRR providing groups from the provision of FRR in accordance with Article 159(7); technical requirements for the connection of RR providing units and RR providing groups defined by the TSO in accordance with Article 161(3); and rejection of RR providing groups from the provision of RR in accordance with Article 162(6).
← art_6__para_3__point_g__text_1 · All articles · art_6__para_4__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.