2.

Text with EEA relevance.

To enable or enhance bi-directional capacity on an interconnection or to obtain or prolong an exemption from that obligation, transmission system operators on both sides of the interconnection shall submit to their competent authorities (‘competent authorities concerned’) and to their regulatory authorities (‘regulatory authorities concerned’) after consulting with all transmission system operators potentially concerned: a proposal to enable permanent physical capacity to transport gas in both directions for permanent bi-directional capacity concerning the reverse direction (‘physical reverse flow capacity’); or a request for an exemption from the obligation to enable bi-directional capacity. The transmission system operators shall endeavour to submit a joint proposal or request for exemption. In the case of a proposal to enable bi-directional capacity, the transmission system operators may make a substantiated proposal for a cross-border cost allocation. Such submission shall take place no later than 1 December 2018 for all interconnections that existed on 1 November 2017, and after completing the feasibility study phase but before the start of detailed technical design phase for new interconnections.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-01 · Text as adopted (Official Journal); later amendments are not incorporated in this text.