The transmission system operators shall endeavour to submit a joint proposal or request for exemption. In the case of a proposal to enable bi-directional capacity, the transmission system operators may make a substantiated proposal for a cross-border cost allocation. Such submission shall take place no later than 1 December 2018 for all interconnections that existed on 1 November 2017, and after completing the feasibility study phase but before the start of detailed technical design phase for new interconnections.