(13) To provide input to the common and national risk assessments, ENTSOG, in consultation with the Gas Coordination Group (GCG) and with the European Network of Transmission System Operators for Electricity (ENTSO-E), should carry out a Union-wide simulation of gas supply and infrastructure disruption scenarios. Such a simulation should be repeated at least every two years. As a means of strengthening regional cooperation by providing information about gas flows as well as providing technical and operational expertise, the Regional Coordination System for Gas (ReCo System for Gas), established by ENTSOG and composed of standing expert groups, should be involved in carrying out simulations. ENTSOG should ensure an appropriate level of transparency and access to the modelling assumptions used in its scenarios.