lexiara

rec_29

Text with EEA relevance.

(29) Capacity at an interconnection point to a Member State may compete with capacity at exit points from the gas grid into a gas storage facility. As a consequence, a situation could arise where firm booking of exit capacity into storage reduces the technically available capacity to be allocated at the interconnection point. In order to ensure a higher level of energy security in an emergency, this Regulation should provide for a clear priority rule. Any booked capacity at interconnection points should be given priority over competing capacity at an exit point into a storage facility, thereby enabling the transmission system operator to allocate the maximum technical capacity at the interconnection point in order to enable higher gas flows into the neighbouring Member State which has declared an emergency. This may have the consequence that gas injections into storage cannot take place or can take place only with reduced volumes despite being firmly booked in advance. To compensate for the resulting financial loss, this Regulation should provide for a fair compensation to be applied directly and promptly between the affected system users. The transmission system operators concerned should cooperate in accordance with the relevant legal acts in order to apply that priority rule.

National law under this provision

1 national measure recorded under this provision, in 1 form — sign in to view the analysis.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-01 · Text as adopted (Official Journal); later amendments are not incorporated in this text.