rec_24
(24) In order to ensure that the opening of support schemes is reciprocal and brings mutual benefits, cooperation agreements should be signed between participating Member States. Member States should retain control over the pace of deployment of renewable electricity capacity on their territory in order, in particular, to take account of associated integration costs and required grid investments. Member States should thus be allowed to limit the participation of installations located on their territory to tenders opened to them by other Member States. Those cooperation agreements should address all relevant aspects, such as accounting for costs relating to a project built by one Member State on the territory of another, including the expenditure relating to strengthening networks, energy transfer, storage and back-up capacity, as well as possible congestions in the network. In those agreements Member States should also take into account measures that may allow for the cost-effective integration of such additional renewable electricity capacity, whether they are of a regulatory nature (for instance related to market design) or provide for additional investments in various sources of flexibility (for instance interconnections, storage, demand response or flexible generation).
← rec_23 · All articles · rec_25 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-28 · Text as adopted (Official Journal); later amendments are not incorporated in this text.